Duncan dam instrumentation

Date

1971-01

Journal Title

Journal ISSN

Volume Title

Publisher

Abstract

Settlement at the 120ft-high Duncan dam reached 14ft during construction. This paper describes the instrumentation of the dam, and the development of a new type of settlement gauge which was installed to depths of 250ft in the soft sand-silt foundation

Description

Reprint from Water Power

Keywords

dam, instrumentation, settlement, civil

Citation

DOI

ISSN

Creative Commons

Creative Commons URI

Items in TSpace are protected by copyright, with all rights reserved, unless otherwise indicated.